Capacity planning
Capacity planning starts with the machine that controls the slowest operation on your repeat work. A written cut list, job mix and spare floor space make the next machine choice easier to price.

Find the limiting machine
Production records show which operation waits while another machine is still cutting, boring, drilling or grinding.
Name that machine first, then compare the waiting work against the size and accuracy range you need.
A larger order book does not prove that another lathe is the right buy; the bottleneck can sit at milling, drilling, pressing or grinding.
Match work to capacity
Written jobs give better capacity figures than general workshop pressure, because machine size only counts when it suits the parts you sell.
A quotation can match those written figures and mark machine options that fall outside the stated envelope.
Used machines need extra attention on included chucks, steadies, tooling, guards and electrical cabinet condition, because missing items affect the working capacity.
A capacity enquiry needs these written figures before machine options can be compared:
- Largest workpiece diameter, length, height and mass that must pass through the chosen operation.
- Smallest tolerance band and surface finish that the added machine must support.
- Current job quantity per week, per batch or per order, stated in written figures.
- Available floor area, door opening and the planned lifting method.
Add the right constraint
One new machine can move the bottleneck to cutting tools, inspection, material handling or operator availability.
Buying beyond the bottleneck ties up floor space, while buying below it leaves the same delayed operation in charge of output.
Quoted options should be compared against the operation that limits delivery dates, not against the largest machine that can fit on the floor.
Plan spares with machines
Output drops when a machine waits for belts, pumps, switches or wear parts that were predictable from the model and duty.
Spares planning belongs with the machine enquiry, because a cheaper purchase can cost production time if wearing parts are unknown.
Ask head office for machine and spares pricing in the same written enquiry so the purchase can be judged as one capacity decision.