Erin Tools

Operator checklist

Daily checklist wording gives your workshop the same start, stop, lubrication and trip record for each shift. The document belongs with your own machine file, control notes and maintenance records.

A man in blue overalls adjusts a metal lathe in a workshop with tools and parts on a workbench.

Daily start and stop

Machine log entries need the machine name, date, operator name and shift, because a later fault report must match the person at the controls. Record oil level, slideway condition, chuck or fixture condition, guard position and emergency stop reset status before spindle start. Selector positions need words rather than ticks, because a tick cannot show whether feed, speed or direction was set.

A stop sequence needs the spindle stopped, feed disengaged, coolant switched off and swarf cleared from the working area. Final notes should state whether a job was left clamped, removed or quarantined for measurement.

Lubrication record entries

Oil-point records need fixed wording, because missed oil points damage slides, screws, bearings and feed parts. A written line for each point also separates operator checks from maintenance work.

Four checklist lines cover the records operators can complete without dismantling the machine:

  • Start record entries covering oil level, guards, selector positions and workholding condition.
  • Stop sequence covering spindle stop, feed disengagement, coolant isolation and swarf clearance.
  • Oil-point record entries covering points, lubricant names and the person who completed the task.
  • Trip records covering the alarm wording, control position and part status at stoppage.

Machine trip records

A trip entry needs the exact alarm wording or fault description, not a short note saying “tripped”. Record the control position, spindle state, feed state and job condition at the moment of stoppage. Restart approval follows a check of the cause, with the approver named in the entry.

Written trip notes protect the next operator from guessing which control was active, which job was loaded, and which action was already taken.

What our machine customers say

Verified Google reviews